Q: I am using Omnitracs Workflow. I have a border event at Detroit and another border event further down the itinerary at Windsor. Why was my Windsor border event updated at the same time as my Detroit border event? The driver did not finish the border event for Windsor yet.
A: Omnitracs workflow does not prioritize the stops. Therefore, as a truck completes stops or breaches geofences along the intended trip, those stops will get completed in the order in which they physically occur, not in the order in which they were dispatched. The work-around would be to refrain from adding the Windsor border event to the Workflow until after the Detroit workflow has been completed.